Indicative investment, across the whole spectrum.
Indicative figures, August 2026, hardware excluding VAT. IT cost per MW varies by more than 3× with density: ~€15–40M/MW for CPU clusters, €75–95M/MW for liquid-cooled accelerated HPC/AI systems; NVMe storage and high-memory nodes exceed €150M/MW.
What does your budget build?
Move the slider to a budget. Every configuration whose published range includes it lights up, together with the work it is built for.
2 configurations fit this budget
Storage server or array
€38–331k
Dedicated capacity for data — the range runs from a disk-based server to an all-flash array.
Typical workloads
- Network file shares (NAS)
- Backup and archiving
- Large research datasets
- Shared storage for virtual machines
CPU rack (private cloud)
€250–900k
A full rack of servers, storage and networking, run as one platform.
Typical workloads
- Private cloud and virtualisation
- Consolidated company IT
- A small HPC cluster
- Disaster-recovery site
| Tier | Typical configuration | Range (EUR, excl. VAT) |
|---|---|---|
| 01 | Desktop | Office / engineering; AI desktop (24–32 GB GPU) | €0.7–4k | AI: €3.5–9k |
| 02 | Workstation | CAD / simulation; AI with 1× 96 GB GPU; multi-GPU | €4–12k | AI: €12–25k | multi-GPU: €30–90k |
| 03 | Rack server | CPU / services; storage; 8× GPU training node | €10–60k | storage: €38–331k | 8× GPU: €440–520k |
| 04 | Server rack | CPU / virtualisation; AI rack (2–4 nodes + fabric) | €250–900k | AI: €1.0–3M |
| 05 | Rack row | Departmental cluster / AI pod with parallel storage | €1.2–8M |
| 06 | Data hall | Institutional system, 0.3–1 MW IT | IT: €6–70M | facility: €5.5–15M |
| 07 | Supercomputer | National scale / EuroHPC class; European mid-segment €12–40M | €10–300M |
Indicative figures, August 2026, hardware excluding VAT. IT cost per MW varies by more than 3× with density: ~€15–40M/MW for CPU clusters, €75–95M/MW for liquid-cooled accelerated HPC/AI systems; NVMe storage and high-memory nodes exceed €150M/MW. Tier 07 is calibrated on European public procurement 2024–2026, where the mid-segment — the one reachable by a specialist integrator — sits at €12–40M, not at exascale. High volatility on GPUs and memory — firm quotes are valid for 30 days. Final pricing on request.
01
Desktop
Office, engineering and AI desktop — the entry point on the spectrum.
€0.7–4k | AI: €3.5–9k
02
Workstation
CAD, simulation and local training — from a single workstation to multi-GPU builds.
€4–12k | AI: €12–25k | multi-GPU: €30–90k
03
Rack server
From service and storage servers to a complete 8-GPU training node.
€10–60k | storage: €38–331k | 8× GPU: €440–520k
04
Server rack
A complete rack — from enterprise virtualisation to an AI rack with its own fabric.
€250–900k | AI: €1.0–3M
05
Rack row
A departmental cluster or AI pod, with a dedicated parallel file system.
€1.2–8M
06
Data hall
An institutional 0.3–1 MW IT system, with the facility engineered alongside it.
IT: €6–70M | facility: €5.5–15M
07
Supercomputer
A national-scale or EuroHPC-class programme, from tender documents to acceptance.
€10–300M
Data-centre construction in Romania — 2026 benchmarks.
0.1–0.3 MW | IT capacity
Server / HPC room
Cost per MW
€18–35M
Total project
€1.8–8.7M
Below 1 MW the €/MW metric loses its meaning: plant rooms, UPS, batteries, generator and suppression do not shrink with power, so a 0.3 MW facility ends up at ~2.7× the per-MW cost of a hyperscale build.
Cost per MW, all seven compared
Per m² built
Seven cost blocks make up the building.
Total GBA (Tier III, DLC)
€2,900–4,600
- Structure & envelope€790–1,18026%
- Technical hall fit-out€660–1,03023%
- Electrical infrastructure€720–1,17025%
- Mechanical infrastructure€380–63014%
- Fire, low-voltage & BMS€140–2505%
- External works & FF&E€90–1603%
- Design, engineering & permits€105–1654%
Bars share one scale | share of the midpoint total
Complete facility (structure + MEP), excluding VAT; includes the grid connection, excludes land and IT equipment. Cost per m² is measured against gross built area, not white space — the international $600–1,100/sq ft benchmark is also on gross area, and applying it to the technical floor underestimates the budget several times over. In a small-scale HPC centre the gross-to-white-space ratio reaches 9:1, because plant rooms, UPS, batteries, generator and suppression do not shrink. Below 1 MW, the €/MW metric loses its meaning: the same fixed costs do not fall in proportion to power, and a 0.3 MW facility ends up at ~2.7× the per-MW cost of a hyperscale build. Calibrated on a real project: a 300 kW IT hall built to Tier III standard with liquid cooling, in a ~1,800 m² building, lands at €5.5–8.7M for the facility. Figures are on a July 2026 basis; Romanian construction costs are rising ~10% a year, so facility quotes are issued with 60-day validity and an INS indexation clause. A 20–30% premium applies in Bucharest / Cluj versus secondary cities.
Five real configurations, with the full budget.
| Example | Configuration | Hardware / IT | Facility |
|---|---|---|---|
| AI workstation | 2× 96 GB GPU, 512 GB RAM, NVMe | €30–36k | — |
| Training server | 8× GPU (141–288 GB), 8× 400G, DLC | €440–520k | — |
| Small server room | 50 kW IT, 40 m², 12 racks, N+1 | €0.5–1.2M | €0.4–0.8M |
| Departmental HPC hall | 300 kW IT, 190 m² technical, ~3–8 PF FP64 | €6–10M | €5.5–8.7M |
| 10 PF FP64 supercomputer | ≈0.3 MW IT, extensible 1,800 m² building, Tier III | €12–28M | €5.5–8.7M |
Total investment
Workstation €32–41k | training server €465–555k | server room €0.95–2.1M | HPC hall €12.5–20M | 10 PF supercomputer €18–40M — including the Kronsavier fee.
Public EuroHPC comparators
Mid-segment, 2026: CASPIr (IE, 15 PF) — €25M | Mimer AIF (SE) — €29.8M | DAEDALUS (GR, 89 PF) — €36M. Large scale: LUMI (FI, 380 PF) — €144.5M | JUPITER (DE, exascale) — €273M. Contract values, including delivery, installation and maintenance.
Indicative figures, August 2026, excluding VAT; land and grid connection excluded. Cost per PF varies sharply with architecture: FP64-optimised systems are significantly more efficient per euro than AI-training-optimised ones.
Tell us the workload. We'll engineer the system.
Whether it is a workstation, a rack or a supercomputer, Kronsavier takes it from requirement to working system, with the engineering documented at every step.